Wednesday, September 13, 2017

MALACCA HIGH SCHOOL HALL RENOVATED

Our school hall built in 1984 was recently renovated with funds allocated by the Ministry of Education.

Before the renovations, the ceiling boards were falling down from the ceiling.

The holes in the ceiling were unsightly and dangerous to the students.

The wooden floor of the hall were also damaged by water falling down from the ceiling.

So, in 2017 after funds made available by the Ministry of Education, it is renovated.

Below are some photos of our renovated school hall.










A sponsor has agreed to have the hall aircond.

The school has requested its PA system to be sponsored as well.